(i) Closing of LC gate no.40 at kms. 391/1-2 between Vamburi- Rahuri by the provision of Road Under Bridge size 6.00 X 6.00m at Kms.391/1-2 by cut and cover method in Daund- Manmad section. (ii) Closing of LC gate no.41 at kms. 394/6-7 between Rahuri- Padhegaon by the provision of Road Under Bridge size 6.00 X 6.00m at Kms.394/6-7 by cut and cover method in Daund- Manmad section.
Work Costing :Rs.380.97 Lakhs. Completed on 10/02/2022.
(i) Closing of LC gate no.42 at kms. 396/0-1 between Rahuri-Padhegaon by the provision of Road Under Bridge size 6.00 X 6.00m at Kms.396/0-1 by cut and cover method in Daund- Manmad section. (ii) Closing of LC gate no.43 at kms. 400/5-6 between Rahuri-Padhegaon by the provision of Road Under Bridge size 6.00 X 5.00m at Kms.400/5-6 by cut and cover method in Daund- Manmad section".
Work Costing :Rs.439.04 Lakhs. Completed on 10/02/2022.
Nanded Division-Khandwa-Akola Section- Conversion of track from MG to BG between Akola and Akot stations- Proposed construction of 2nd High-Level Platform, Foot Over Bridge at Ugwe, Gandhismarak road, Patsul and Akot stations in Akola dist. Maharashtra State.
Tender Cost: Rs. 1622.67 Lakhs
Construction of Major Bridge Across Gautami River in Km 15/00 on Telhara Wadi Adampur Ukali Bazar Wangargaon Babhulgaon Telegaon Dawala Adsul Road ODR-64 Tq. Telhara in District Akola Maharashtra
Completion of work of Railway Over Bridge (ROB) @ Akot Taluka - Akot District - Akola, Maharashtra under joint guidance of South Central Railway and PWD (Maharashtra).