COMPLETED PROJECTS
Construction and Development of Garden

Construction and Development of Garden at Siddhabet Parisar in Alandi Tal & Dist-Pune

Work Costing : Rs.717.21 Lakhs.  Completed on 16/08/2018.

Jaipur Minor Irrigation Tank, Tal & Dist: Washim

Jaipur Minor Irrigation Tank, Tal & Dist: Washim. Construction of Earthen Dam, Head Regulator, waste weir, approach & tail channel & fall at R.D.0, 180,375, and 425 M.

Work Costing : Rs.6765.39 Lakhs.  Completed on 21/05/2019.

Nanded Division: Khandwa -Akola Section

Nanded Division: Khandwa -Akola Section-Conversion of track from MG to BG between Akola and Akot stations. Execution of Earthwork in embankment/cutting, Blanketing to GE.14 Specification of RDSO, construction of minor bridges, Road under bridges, including dismantling of track and other Misc. works Excluding Major Bridges from Ch:724100m to Ch: 740600m in between Akola and Gandhi Smarak Road stations in Maharashtra State [Reach-I]

Work Costing : Rs.7493.10 Lakhs.  Completed on 27/07/2019.

Talwade Bhamer Feeder Canal

Talwade Bhamer Feeder Canal, Tal- Baglan (Satana), Dist- Nashik. Constructing Earthwork and structures in Km No. 6 to 10 of Talwade Bhamer Feeder Canal.

Work Costing : Rs.458.88 Lakhs.  Completed on 26/09/2019.

Nanded Division-Khandwa-Akola Section

Nanded Division-Khandwa-Akola Section- Conversion of track from MG to BG between Akola and Akot stations-(1)Proposed construction of 3 x 18.30 m PSC girders (Super structure only) for Br No 710/1 at km 710/3-4 between Gandhi Smarak Road and Parsul stations (2)Proposed Construction of Bridge No 734/1A (RUB) in lieu of LC No 74 (S.H- 240) as 2 X 9.15m PSC slabs with pile foundation at km 734/4-5 between Ugwe and Akola stations in Akola dist. Maharashtra State.

Work Costing : Rs.585.38 Lakhs.   Completed on 26/12/2019.

 Previous 1 2 3 4 Next